Quickset Downey Concrete Company
(562) 414-1029Start your projectCall (562) 414-1029

Concrete floor installation in Downey CA - a flat slab built on a solid base

Old slab cracked, uneven or gone? We pour a new concrete floor on a packed base, built to take flooring, a coating or everyday use.

Concrete patio beneath a timber pergola beside a red-brick house, with a smooth light-gray floor.

Concrete floor installation that starts below the surface

Concrete floor installation in Downey means we form, pour and finish a flat slab that's either the floor you walk on or the base for tile, wood or a coating. You usually need one when the old slab has cracked, sunk or never sat level, or when a garage or addition needs a floor. The work starts in the ground, the same way our concrete steps and pool decks do.

Price comes down to the floor's size, any old concrete to remove, how much work the ground under it needs and whether rebar, the steel inside the slab, goes in. The schedule turns on the permit, its inspections and the weather on pour day. If the budget's tight, the base is the last thing I'd cut, because nobody sees it on day one and everyone sees it once a slab settles. Your written estimate spells out what's included.

On pour day the timing of finishing and the saw cuts matters most, because work done too early or too late can leave a weak top, high and low spots or cracks where nobody planned them. So we plan the crew around that day, and it's a fair thing to ask any contractor you're comparing.

Concrete floors built from the base up

You get a slab that sits flat and gives tile, wood or a coating a sound base, because we do the hidden work under it first.

  • I write every estimate and stay on site through the pour
  • Nine years in business, since 2017
  • Licensed and insured for concrete floor work
  • The base dug out and packed, not raked level

How your floor job runs

  1. Call or send a message

    Call (562) 414-1029 or use the form, and we'll set a time for me to come out and look at the space.

  2. I measure and write it up

    I measure, look at the old slab and the ground under it, and write an estimate that spells out the work and what's included.

  3. Permit, prep and pour

    Once you say yes, we sort out any permit, dig out and pack the base, set forms and steel, get it inspected, then pour, finish and clean up.

Plan your floor with Quickset in Downey

Send the floor's size, garage or indoor, and any flooring planned on top. We reply within one business day to set a free, no-obligation on-site estimate.

Stamped concrete patio with an irregular stone pattern surrounds a circular stone fire pit beside a house.

Concrete floor questions we hear

Will a new concrete floor crack like my old one?

Some cracking is likely even on a well-built floor, since a national concrete guide says a fully crack-free floor isn't realistic. What we control is where it cracks. Control joints, saw cuts that give the slab a straight line to crack along, usually go in 4 to 12 hours after the pour, a contractor's guide says, depending on heat and the mix.

What goes under a concrete floor if flooring goes on top?

A vapor retarder goes under it, which is a moisture barrier, and a national concrete guide says it protects flooring and coatings most when it sits right against the slab. One barrier maker warns that even small holes can let much more moisture through and lead to flooring failures. So we check where it sits and look it over for tears before we pour.

Do I need a permit for a concrete floor in Downey?

Usually, yes. The Building counter at Downey City Hall issues permits, and it generally requires one for new construction, additions, alterations and repairs to an existing building. The city takes applications online through its Citizen Access portal, from a licensed contractor or an owner-builder living in a single-family home. If it does, we pull it as the licensed contractor and set up inspections.

Does a concrete floor contractor need a license in California?

Yes, for almost any floor job. The California Contractors State License Board licenses anyone who builds or alters a structure in the state, and a license is required when the job needs a building permit, uses employee labor or totals $1,000 or more in labor and materials. A floor that needs a permit already meets the first test.

How much does a concrete floor cost around Downey?

A concrete garage floor in the Los Angeles area usually costs about $8 to $15 per square foot. That's what the market runs, not our price, and indoor floors or jobs with old concrete to remove are priced on their own. I measure your space and write an estimate that spells out what's included for your floor.

Ask Quickset in Downey for a free estimate

Call (562) 414-1029 or use the form, because the sooner I see the space, the sooner we both know what the base and the permit will take.

Wide stone-faced front steps with pale concrete treads lead to a wooden entry framed by timber columns.
Call(562) 414-1029